![A graph showing the tax funding and revenue of UTA per year. Data provided by UTA.](https://thesignpostwsu.com/wp-content/uploads/2024/04/Jer-Bates-Infographic.jpg)
Tickets please: A look at UTA’s fares
Jer Bates, Contributor
• April 16, 2024
![The Ogden area system map for OGX.](https://thesignpostwsu.com/wp-content/uploads/2023/09/FHgR14bS6OEMiK8CvOwhsl8BVFvYyFG1qTvecf8U-1200x862.jpg)
Rolling with OGX
Tim Costello, Reporter
• September 26, 2023
![Waldo the Wildcat posing in front of the OGX bus, while forming a W with his paws.](https://thesignpostwsu.com/wp-content/uploads/2023/08/etCnJRqRiWvGjrHDjUwRM7jkYYlOPApYmeJCi6Qg-1200x801.jpg)
Next stop: OGX
Sky Mundell, Asst. News Editor
• August 28, 2023
![The 28th Street OGX stop in front of Ogden High School.](https://thesignpostwsu.com/wp-content/uploads/2023/06/JDbSHd7FaHpOjUbetyYuiF7GT8kIFF9pxJPxguta-900x562.jpg)
OGX on the way
Tim Costello, Reporter
• June 13, 2023
News Quiz 2/14
Tim Costello, News editor
• February 14, 2023
Cronograma de transporte OGX’s
Nathanael Stout, Translator
• November 17, 2022
![The OGX busses have a sign on the back of their vehicle with the number of the bus, as well as the term Wildcat Shuttle for the school.](https://thesignpostwsu.com/wp-content/uploads/2022/11/wtBNVCchpjaHijflShHAdiK7hg1b2poqswUNgyky-900x600.jpg)
OGX’s transportation timeline
Brisa Odenthal, Reporter
• November 17, 2022
![Cars parked at a parking lot located at the bottom of Ogden campus.](https://thesignpostwsu.com/wp-content/uploads/2022/09/zNCNtpUofJkze7JE8VxcnZ8IcnhgpEA4ZviZCp21-900x600.jpeg)
Eye spy a parking spot
Hunter Lindsey, Reporter
• September 6, 2022
![A view of the Central campus bus stop from a window in the Browning Center building.](https://thesignpostwsu.com/wp-content/uploads/2022/06/oy0731EzsKjfaXqfAFdaswbBgU8j4xpbd4chQAGI-900x675.jpeg)
OGX: Ogden’s eco-friendly public transportation solution
Sky Mundell, Reporter
• June 13, 2022
![The Clear the Air Challenge is a statewide effort toward better air quality. Photo credit: Weber State University](https://thesignpostwsu.com/wp-content/uploads/2022/02/i-DtT7bWC-X5-900x600.jpg)
The air outside is frightful
Rebecca Baggett
• February 2, 2022
![Morning traffic on Ogdens Edvalson street approaches the Noorda Engineering, Applied Science and Technology building construction site. Photo credit: Kennedy Robins](https://thesignpostwsu.com/wp-content/uploads/2021/11/UTA-and-Construction-Kennedy-Robins-10-of-20-900x600.jpg)
Continuous campus construction
Kennedy Robins
• November 17, 2021
![The mural integrates the beauty of bright colors while tying in the importance of music in the citys history. (Nikki Dorber/The Signpost) Photo credit: Nikki Dorber](https://thesignpostwsu.com/wp-content/uploads/2021/11/murals-nikki-dorber-11012021-900x600.jpg)
A stop above the rest
Lucas Moore
• November 1, 2021
Load More Stories
Latest YouTube Video