The Student News Site of Weber State University

The Signpost

The Signpost

The Signpost

The Signpost

Computer from the plastics lab that was left outside all summer and melted.

An update on the renovation of Engineering Technology building

Lexie Andrew, Culture Editor February 22, 2024

The Engineering Technology building is in the process of being remodeled, despite several setbacks. The remodel consists of two phases. Inside the building, there is a distinct line between the finished...

Valve repairs related to the demolition have begun new issues for campus life. (Robert Lewis / The Signpost)

Emergency valve repairs in progress

Adam Rubin June 14, 2021

Many buildings in the main core of Weber State University’s campus were not able to be cooled after the campus was impacted by two seized valves near the Science Lab demolition, which effectively...

Photo credit: Pixabay

Police Blotter Feb. 16

Marisa Nelson February 12, 2021

Is this a drill?On Feb. 1 and Feb. 2, there were two accidental fire alarms on campus. The first was in the Shepherd Union Building around 1:30 p.m. The fire marshal and Weber State University police communicated...

Main entrance to the Engineering Technology Building, located east of Tracy Hall. (Joshua Wineholt / The Signpost)

WSU draws up plans for engineering building

Chris Nichols September 20, 2017

The Utah System of Higher Education plans on requesting money from the state legislature to improve Utah college campuses. A portion of the proposed amount is allocated to Weber State University for remodeling...

Load More Stories

Comments (0)

Comments written below are solely the opinions of the author and does not reflect The Signpost staff or its affiliates.
All The Signpost Picks Reader Picks Sort: Newest