![The newly completed renovation of the Ada Lindquist Plaza and Pond, added many aesthetic and environmental features to the pond.](https://thesignpostwsu.com/wp-content/uploads/2024/01/zaqXWaCvj98zZdesvoeNF6W9Lvkh2NmnEB7Rkry9-1200x800.jpg)
El estanque de patos de Weber recibe un cambio de imagen
Gretel Monjar, Asst. Section Editor
• January 9, 2024
A duck pond do-over
Brisa Odenthal, News Editor
• August 28, 2023
![Road Closed and Sidewalk Closed signs blocking off construction zones.](https://thesignpostwsu.com/wp-content/uploads/2023/03/GigBhEmXXsM3Q4y5ZhKhDBQYAMq9fL2YFpurgIXt-900x600.jpg)
Another construction update: Redesigning Weber’s campus
Adam Rubin, Reporter
• March 23, 2023
![Road Closed and Sidewalk Closed signs blocking off construction zones.](https://thesignpostwsu.com/wp-content/uploads/2023/03/GigBhEmXXsM3Q4y5ZhKhDBQYAMq9fL2YFpurgIXt-1-900x600.jpg)
Otra actualización de la construcción
Daniela Imbrett, Traductor
• March 23, 2023
An education renovation
Adam Rubin, Reporter
• January 26, 2023
Cronograma de transporte OGX’s
Nathanael Stout, Translator
• November 17, 2022
![The OGX busses have a sign on the back of their vehicle with the number of the bus, as well as the term Wildcat Shuttle for the school.](https://thesignpostwsu.com/wp-content/uploads/2022/11/wtBNVCchpjaHijflShHAdiK7hg1b2poqswUNgyky-900x600.jpg)
OGX’s transportation timeline
Brisa Odenthal, Reporter
• November 17, 2022
![The final section of the Browning Center bus stop will be finished in the next year. Photo credit: Summer Muster](https://thesignpostwsu.com/wp-content/uploads/2022/03/OGX-Enterprise-5-900x600.jpg)
OGXpectations
Alexandrea Bonilla
• March 28, 2022
![Tractors and other equipment for the construction are seen all over campus as a result of the construction. (Bella Torres / The Signpost)](https://thesignpostwsu.com/wp-content/uploads/2021/08/6-7-2021-BRT-Construction-Update-Bella-Torres-3-of-5-900x600.jpg)
Bus rapid transit system begins to take shape on campus
Adam Rubin
• August 27, 2021
![Work takes place at the field west of the Social Science building construction. (Joshua Wineholt / The Signpost)](https://thesignpostwsu.com/wp-content/uploads/2017/09/9-6-Geothermal-Joshua-Wineholt-3374-900x600.jpg)
New social science structure seeks subterranean source of energy
John Wise
• September 7, 2017
Burst pipe causes flooding at WSU
July 11, 2013
Load More Stories
Latest YouTube Video