![Road Closed and Sidewalk Closed signs blocking off construction zones.](https://thesignpostwsu.com/wp-content/uploads/2023/03/GigBhEmXXsM3Q4y5ZhKhDBQYAMq9fL2YFpurgIXt-900x600.jpg)
Another construction update: Redesigning Weber’s campus
Adam Rubin, Reporter
• March 23, 2023
![Road Closed and Sidewalk Closed signs blocking off construction zones.](https://thesignpostwsu.com/wp-content/uploads/2023/03/GigBhEmXXsM3Q4y5ZhKhDBQYAMq9fL2YFpurgIXt-1-900x600.jpg)
Otra actualización de la construcción
Daniela Imbrett, Traductor
• March 23, 2023
![The final section of the Browning Center bus stop will be finished in the next year. Photo credit: Summer Muster](https://thesignpostwsu.com/wp-content/uploads/2022/03/OGX-Enterprise-5-900x600.jpg)
OGXpectations
Alexandrea Bonilla
• March 28, 2022
![Morning traffic on Ogdens Edvalson street approaches the Noorda Engineering, Applied Science and Technology building construction site. Photo credit: Kennedy Robins](https://thesignpostwsu.com/wp-content/uploads/2021/11/UTA-and-Construction-Kennedy-Robins-10-of-20-900x600.jpg)
Continuous campus construction
Kennedy Robins
• November 17, 2021
![Backpacks hang on a wall next to picture of a rock climber for new Outdoor Program Recreation Center. (Katherine Berghout/ The Signpost)](https://thesignpostwsu.com/wp-content/uploads/2021/02/IMG_8164-2-900x600.jpg)
Opening the door to a new outdoor recreation center
Adam Rubin
• February 8, 2021
![Construction is ongoing at Weber State University. Crews have taken advantage of the winter break. (Nikki Dorber / The Signpost)](https://thesignpostwsu.com/wp-content/uploads/2021/01/construction-1024x575-1-900x505.jpg)
In with the new: outdoor center nearly ready, Noorda well underway
Joshua Kamp
• January 11, 2021
Students weigh in on campus construction
March 19, 2015
SIL offices under construction
July 8, 2013
Load More Stories
Latest YouTube Video